Services

Services


Our company encompasses a sprawling area of 20,000 square meters, boasting a remarkable monthly production capacity of 450,000 square meters. Equipped with state-of-the-art production machinery, a comprehensive testing system, and a rigorous quality supervision and management framework, we are committed to upholding the highest standards of product quality, adhering to both national and European benchmarks. Our global reach extends to esteemed markets in ASEAN, the Middle East, Europe, Africa, and America, as we proudly export our offerings to these regions.

--------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------

Installation

1.Ground leveling

The difference between height and height should be within 2 mm(preferably self-leveling)

2. Ground mattress

Choose ordinary damp-proof cushion, mute cushion or special cushion for floor heating as required. The choice of cushion should not exceed 1.5mm.

3. Flooring

The room should be surrounded by 10 mm contraction joints (8 m interval for contraction transition when paving corridors or large areas).

Note: When used as geothermal floor, there are 12-15mm shrinkage joints around the floor and staggered pavement when laying the floor

4. Cutting Floor

When laying on the wall, the electric saw cuts more neatly and beautifully.

5. Assembly Method

When splicing the floor, the short side is tilted into the side groove, spliced and then tapped slightly to lock it.

6. Irregular Cutting

In case of irregular corners, use angle mill to cut the floor into corresponding shapes.

7. Installation of skirting

After the floor is installed, install matching decorative lines to make the room more beautiful.

8. Cleaning after installation

Clean the site and surrounding area after installation



Hotline

+86 17714007533

jordanflooring

Wechat